TDCAA    TDCAA Community  Hop To Forum Categories  Civil    Commissioner's fight with telephone company
Go
New
Find
Notify
Tools
Reply
  
Commissioner's fight with telephone company Login/Join 
Member
posted
Can the county stop (tomorrow) Windstream from cutting into an expensive interstection in the county road to patch a telephone line that was cut by the county when not buried the required depth (oh, by the way the commissioner faild to contact dig test before doing the repair that cut the line)?

Can the county tell Windstream where to dig to repair the patch so the intersection of the road won't be affected?

Thanks
 
Posts: 5 | Location: Haskell, Texas, USA | Registered: April 17, 2007Reply With QuoteReport This Post
Member
posted Hide Post
See: Tex. Util. C. Sect. 251.156(a)(7) - OTHER EXCEPTIONS TO DUTY OF EXCAVATORS. (a) Section 251.151 does not apply to...(7) routine maintenance by a county employee on a county road right-of-way to a depth of not more than 24 inches.
 
Posts: 188 | Location: Lubbock, Texas USA | Registered: October 04, 2002Reply With QuoteReport This Post
Member
posted Hide Post
Now that I know my commissioner did not violate the Texas Utilities Code, does he have any say about where the repair to the line he damaged occurs?
 
Posts: 5 | Location: Haskell, Texas, USA | Registered: April 17, 2007Reply With QuoteReport This Post
Member
posted Hide Post
Don't know if it will help with more than bluff value, but take a look at LGC 240.907 - and offer them the choice of $ or repairing where you tell them to!

Lisa L. Peterson
Nolan County Attorney
 
Posts: 736 | Location: Sweetwater TX | Registered: January 30, 2001Reply With QuoteReport This Post
Member
posted Hide Post
See also: Tex. Utilities Code � 181.082 (2007)� 181.082. AUTHORITY TO INSTALL FACILITY IN RELATION TO PUBLIC PROPERTY - A telephone or telegraph corporation may install a facility of the corporation along, on, or across a public road, a public street, or public water in a manner that does not inconvenience the public in the use of the road, street, or water.

Based in part on this statute, we have a County Utility Accomodation Policy which requires the utilities to bore under roads, rather than trench across them. At the least, if they must tear up the road to fix the line, they are required to repair the road to a condition acceptable to the County...at least as good as the condition the road was in prior to the utility's repair work.

This can be very difficult to achieve if you make them certify soil compaction and road smoothness. Tell them they will have to post a bond to cover any repairs for two years after they repair the road.
 
Posts: 188 | Location: Lubbock, Texas USA | Registered: October 04, 2002Reply With QuoteReport This Post
  Powered by Social Strata  
 

TDCAA    TDCAA Community  Hop To Forum Categories  Civil    Commissioner's fight with telephone company

© TDCAA, 2001. All Rights Reserved.